Tools required for installation parts – CHIEF RXT2 User Manual

Page 6

Advertising
background image

RMT2/RLT2/RXT2

Installation Instructions

6

TOOLS REQUIRED FOR INSTALLATION

PARTS

7/32" (5.5mm)

#2

1/2" (12.7mm)

5/16" (7.9mm)

GC(6)

M4 x 25mm

GG(6)

M5 x25mm

GK(6)

M6 x 35mm

GN(6)

M8 x 40mm

1/2"(12.7mm)

A(1)

[wall plate]

B(1)

[left upright]

GA(8)

M4 x 16mm

GB(6)

M4 x 20mm

GD(6)

M4 x 35mm

GE(6)

M5 x16mm

GF(6)

M5 x20mm

GI(6)

M6 x16mm

GJ(6)

M6 x 25mm

GL(6)

M8 x 20mm

GM(6)

M8 x 30mm

GO(6)

M8 x 50mm

GP(8)

1/4"(6.4mm)

GQ(8)

GS(8)

[universal washer]

D(4 or 6)

5/16 x 2 1/2"

E(4 or 6)

5/16"

F(4 or 6)

[concrete anchor]

C(1)

[right upright]

For below kit, quantities
are 4 for RMT2 and RLT2,
6 for RXT2.

(RXT2 shown)

GH(6)

M5 x 35mm

G(1)

Hardware Bag

Advertising
This manual is related to the following products: