Tools required for installation parts – CHIEF RXF2 User Manual

Page 6

Advertising
background image

RMF2/RLF2/RXF2

Installation Instructions

6

TOOLS REQUIRED FOR INSTALLATION

PARTS

7/32" (5.5mm)

#2

1/2" (12.7mm)

5/16" (7.9mm)

1/2"(12.7mm)

A(1)

[wall plate]

B(2)

[vertical bracket]

FL(6)

M8 x 20mm

FM(6)

M8 x 30mm

FN(6)

M8 x 40mm

FO(6)

M8 x 50mm

FI(6)

M6 x 16mm

FJ(6)

M6 x 25mm

FK(6)

M6 x 35mm

FE(6)

M5 x 16mm

FF(6)

M5 x 20mm

FG(6)

M5 x 25mm

FH(6)

M5 x 35mm

FA(8)

M4 x 16mm

FB(6)

M4 x 20mm

FC(6)

M4 x 25mm

FD(6)

M4 x 35mm

FP(8)

1/4"(6.4mm)

FQ(8)

FS(8)

[universal washer]

C(4 or 6)

5/16 x 2 1/2"

D(4 or 6)

5/16"

E(4 or 6)

[concrete anchor]

For below kit, quantities

are 4 for RMF2 and

RLF2, 6 for RXF2

[RLF2 shown]

Hardware Bag

F (1)

Advertising
This manual is related to the following products: