CHIEF K1P Series User Manual

Page 12

Advertising
background image

K1P Series

Installation Instructions

12

Cable Management

1.

Press insides of cable management covers at both ends to
unhinge tabs on either end of cable management cover on
upper arm. (See Figure 18)

2.

Lift cable management cover up until tabs are unhinged and
cover is in the “open” position. (See Figure 18)

Figure 18

Figure 19

3.

Route cables through cable management channels. (See
Figure 19)

IMPORTANT ! : Be sure to leave enough slack in the
cables near display and arm joint to allow for full arm
articulation!

4.

Close cable management covers on monitor arm. (See
Figure 19)

5.

Repeat Steps 1-4 for lower arm.

Array Models

1.

Install array cable clips (J7) to back of array. (See Figure 20)

2.

Route cables through array cable clips (J7) as desired. (See
Figure 20)

3.

Route cables through arm cable clips as desired. (See
Figure 20)

Figure 20

cable management cover tabs

1

2

2

2

4

4

3

3

cable (typical)

(J7)

2

1

3

Advertising