Loading the rack – CHIEF NG1F28-36-44 User Manual

Page 7

Advertising
background image

Installation Instructions

NG1F28-36-44

7

6.

Change optional logo panel by removing and saving 4 nuts
from studs at inside top of front. (See Figure 7)

7.

Remove blank panel and replace with optional personalized
logo panel (not included). (See Figure 7)

8.

Replace and tighten four nuts removed in Step 6.

Figure 7

LOADING THE RACK

NOTE:

The alignment panels shipped with the racks are

optional. They may be removed to facilitate loading of
the racks.

Load Distribution

CAUTION:

BEGIN PLACEMENT OF LOAD AT BOTTOM

OF RACK! Load rack, moving from bottom toward top of rack.
Loading rack incorrectly may result in instability causing
possibly injury and/or damage to components.

1.

Begin placement of components into the rack at the lowest
point.

2.

Continue placing items into the rack, moving from the
bottom upward.

CAUTION:

DISTRIBUTE LOAD CORRECTLY! Load rack

with 2/3 total weight of components in the lower half of rack.
Loading rack incorrectly may result in instability causing
possible injury and/or damage to components.

6

8

logo panel

(front view of rack)

Advertising