Neo glass door & panel installation (continued), C - glass panel installation, Glass is tempered and cannot be cut – American Bath Factory Neo Supreme Carolina Shower User Manual

Page 2

Advertising
background image

NEO GLASS DOOR & PANEL INSTALLATION (continued)

2

C - Glass Panel Installation

1. Carefully lift the glass panels and set them into the side and pan channels. Make sure the glass

panels are stable. (diagram 3) The glass channels in the shower pan and wall thresholds will

hold the glass in place while dry-fitting the panels and door.

2.

The gap between the glass panels and the door should be 1/4”

3. Measure the positioning of the glass panels to ensure they are in the correct position. Make

sure the glass is level across the top and also the vertical edges are square and straight to each

other. Measure diagonally to check for straightness. Make any necessary adjustments.

(diagram 5)

Glass is tempered and cannot be cut

diagram 3

X

X

diagram 4

glass panel

glass panel

shower pan

top of shower pan

threshold

note: measurements taken from outside edges of glass.

diagram 5

inside of shower

outside of shower

glass panel

glass panel

1/4” Gap

1/4” Gap

Advertising