Draw-Tite 24711 SPORTFRAME HITCH User Manual

Installation instructions, Chrysler sebring convertible, Part numbers

Advertising
background image

Drill Bits: 1/2”

Wrenches: 7/8”

Installation Instructions

CHRYSLER SEBRING

CONVERTIBLE

Part Numbers:

77092

24711

60850

Hitch Shown In Proper Position

Wiring Access Location: PC3, PC4

Equipment Required:

1. FISHWIRE BLOCK AND CARRIAGE BOLT THROUGH ACCESS HOLE AT TOP OF FRAME RAIL AND INTO EXISTING HOLES.
2. RAISE HITCH INTO POSITION AND SECURE WITH CONICAL TOOTHED WASHERS AND NUTS.
3. USING FORWARDMOST SLOT IN HITCH AS A TEMPLATE, DRILL 1/2” HOLE INTO FRAME RAIL, EACH SIDE.
4. FISHWIRE REMAINING BLOCKS AND CARRIAGE BOLTS INTO THE HOLES DRILLED IN STEP3. SECURE WITH CONICAL TOOTHED

WASHERS AND NUTS.

Rev. C

10-1-07

N24711

Sheet 1 of 3

z

2006,2007 Cequent Towing Products

Nut, 1/2-13

Qty. (4)

4

Block, 0.25 x 1.50 x 2.00

Qty. (4)

2

Washer, Conical Toothed

Qty. (4)

3

Bolt, Carriage 1/2-13 x 1.75

Qty. (4)

1

Tighten all 1/2-13 fasteners with torque wrench to 75 Lb.-Ft.

Note: check hitch frequently, making sure all fasteners and ball are properly tightened. If hitch is removed, plug all holes in trunk pan or other body panels to

prevent entry of water and exhaust fumes. A hitch or ball which has been damaged should be removed and replaced. Observe safety precautions when working

beneath a vehicle and wear eye protection. Do not cut access or attachment holes with a torch.
This product complies with safety specifications and requirements for connecting devices and towing systems of the state of New York, V.E.S.C. Regulation V-5

and SAE J684.

2000 LB (908 Kg) Max Gross Trailer Weight

200 LB (90.8 Kg) Max Tongue Weight

Do Not Exceed Lower of Towing Vehicle

Manufacturer’s Rating or

Drawbar must be used in the
RISE position only.

Drawbar Kit:

3592

Fastener Kit: F24711

Form F206 Rev A 5605

FRAME RAIL

EXISTING HOLE
IN FRAME RAIL
EACH SIDE

DRILL HOLE
IN FRAME RAIL
EACH SIDE

ACCES HOLE AT
TOP OF FRAME RAIL

ACCES HOLE AT
TOP OF FRAME RAIL

FRAME

DRILLED HOLE

EXAMPLE OF FISHWIRE PROCEDURE

KINK FISHWIRE
TO KEEP BLOCK
INDEPENDENT OF BOLT

EXISTING
HOLE

1234

Advertising