Installation instructions, Custom quick install mounting kit dodge ram 1500, Part numbers – Draw-Tite 50083 CUSTOM QUICK INSTALL BRACKETS User Manual

Page 6

Advertising
background image

Installation Instructions

Part Numbers:

50083

©

2011, 2013, 2014 Cequent Performance Products

Sheet 5 of 6

50083N

2/18/2014

Rev. E

CUSTOM QUICK INSTALL

MOUNTING KIT

Dodge Ram 1500

1.

Do not install mounting rails over plastic bed liners. Plastic bed liners must be cut out of the way to provide metal to metal contact.
Mounting rails may be installed on spray in liners.

2.

Use only bolts, nuts, and washers supplied to install this kit. All bolts are grade 5 and nuts are grade 5 unless otherwise specified.

3.

DO NOT INSTALL THIS PRODUCT ON OR ATTEMPT TO TOW WITH A TRUCK WITH A BED THAT IS
LESS THAN 6’ LONG.

4.

These instructions are guidelines only, actual installation is the responsibility of the installer and the owner. Always measure truck
and trailer before installing hitch to be sure that there is clearance at the cab and at the bumper to allow for turns.

5.

On the driver’s side frame rail, temporarily remove the forward hex nuts and ground wires attached to the vehicle frame.

6.

Remove the spare tire if this helps to give more room to install the product.

7.

Remove the plastic fender wells.

8.

Place the rearward mounting rail in the bed of the vehicle. Center the rail from left to right on the floor of the truck bed and use
your tape measure to locate the proper distance from the rear of the rail to the rear edge of the truck box as illustrated on page 6.

9.

Use a center punch to mark the holes in the rail as shown in illustration on page 6. Move the rail out of the way and drill each
position through the bed with a 1/8” drill bit. Note: On the driver’s side of the vehicle the gas tank is located below the bed of
the vehicle. When drilling holes through the bed be sure not to damage the fuel tank.

10.

For Dual Exhaust, remove driver’s side exhaust hanger from cross-member. If no Dual Exhaust, go to next step.

11.

To place the c-channel above the cross member as shown on page 4. Temporarily remove the plastic clips that hold the wiring
harness to the top of the cross member. Also remove the rear differential breather tube from the cross member. Place c-channel
approximately centered from left to right. Check that the 1/8” drilled holes align with the slots in the c-channel.

12.

Enlarge the 1/8” drilled holes to 1-1/8” with a hole saw.

13.

Fasten the c-channel to the vehicle frame as shown in Figure 2 using 5/8” hardware. Bolt up through the trucks cross member.
Install the 1-3/4” long tube spacers above the channel and within truck bed.

14.

Reposition the mounting rail over the tube spacer installed in step 13, and fasten the mounting rail to the c-channel using the
supplied 5/8” hex bolts. Note: Be sure 1-3/4” long tube spacers are installed between the c-channel and mounting rails to ensure
metal to metal contact.

15.

For Dual exhaust, reattach exhaust hanger that was removed in step 10.

16.

Place the unassembled 5

th

wheel support arches/slider/goose into the already installed mounting rail. Position the forward mounting

rail with the support arches/slider/goose by inserting the tabs into the mounting rail and pushing the mounting rail tight towards the
other mounting rail. Ensure that the mounting rail is centered on the bed of the vehicle. This will position the rail in the correct
location and ensure that the 5

th

wheel will have a snug fit to the truck. Note: If more than one hitch product will be used with the

mounting rails then both types should be used at the same time to align the rearward mounting rail. This will ensure that one product
does not compromise the fit of the other.

17.

Use a center punch to mark the holes in the forward rail per the illustration. Move the rail out of the way and drill each position
with a 1/8” drill bit.

18.

Install the front frame rail brackets as shown on page 4. Use the ½” pull wire to pull the carriage bolts and square hole plates into
the frame. Enlarge 1/8” drilled holes to 5/8” with a drill bit. Install the 1.27” tube spacer in hole just drilled. If the hole drilled in
your bed falls on the rise of your corrugation, place 5” x 1” block (part #13) underneath bed. If the hole falls in the dip of your
corrugation, place block on top of bed. Reposition the mounting rails over the holes drilled in the bed. Fasten the front rail to the
frame brackets as shown in figure 2 using the 5/8” bolt and flat washer down through the rail and tube spacer. Fasten with 5/8”
serrated washer and nut.

19.

Starting with the hex bolts that fasten the rails to the frame brackets, torque all the nuts. Torque the fasteners that attach the frame
brackets to the vehicle frame. Torque the 5/8” fasteners to 150 (ft-lb.) 204 (N*M) Torque the 1/2” fasteners to 75 (ft-lb.) 102
(N*M)

20.

Re-install the ground wires remove in installation step 5. Re-install spare tire. Re-install spare tire. Re-attach the wiring harness and
the differential breather tube that were removed in step 10.

(Does not fit 5-1/2’ beds)

FOR

INSTALLATION OF

30124 OR 30095

RAIL KITS

Printed in Mexico

Advertising