Installation instructions, 4435 installation – Draw-Tite 4435 GOOSENECK RAIL KIT User Manual

Page 8

Advertising
background image

Installation Instructions

GOOSENECK MOUNTING KIT

Dodge Ram 2500/3500 Heavy Duty
Short & Long Bed, & All Megacabs

6300/8339/83391/83399 GOOSENECK HITCH

Part Numbers:

4435

INSTALLATION

Template p/n 5978 for use with 6300 head

Template p/n 114234 for use with 8339 head

Template p/n 114523 for use with 83399/83391 heads

Durable and reusable stainless steel templates are also

available. A time saver for cutting bed liner and bed.
Template p/n 6467 for use with 6300 head

Template p/n 6425 for use with 8339 head

Template p/n 58384 for use with 83399/83391 heads

WARNING The fuel tank and/or other vehicle components may be located below some of the

holes. A wood or metal shield must be placed between the frame and the fuel tank or other critical

components to prevent damage when the drill breaks through the bed.

10.

Install the hitch into the opening.

Figure 5

Vehicle forward

5/8” X 2.50” Carriage Bolt

Lockwasher

Hex Nut

4 Places

10

Gooseneck

platform

5/8” U-Bolt 5-1/2” length – 2 places

Safety chain attachment

Truck bed corrugation

1” x 2” shims

4 places

11.

Use the hitch as a guide to drill the 5/8” diameter holes for the rearward cross member and the U-Bolts holes if

installing a 6300 or 8339 gooseneck hitch.

12.

Before installing the 5/8” carriage bolts through the hitch, the U-Block shims must be placed between the hitch and

the bed and between the cross members and the bottom of the bed (see Figure 6) These shims are necessary to

Figure 6

Large flat washer – 8 places

Spring – 4 places

Forward cross member

platform

3 visible full bolt

threads required

5/8” – 18 locking jam nut

4 places

uc bed co ug o

the bed and between the cross members and the bottom of the bed (see Figure 6). These shims are necessary to

prevent the bed corrugations from collapsing when the bolts are tightened.

13.

Align the rearward cross member with the 5/8” diameter drilled holes.

13.

Install the 5/8 X 2.50 GR5 carriage bolts through the hitch, shims and cross members. Secure with lock washers and

nuts. Torque nuts to 150 ft.-lb. (203 N-m).

14.

For 6300 and 8339 Installations: Install the (2) U-bolts through the hitch. From under the vehicle install the large

flat washer over the U-Bolt followed by a spring, another large flat washer and secure with a thin 5/8” jam nut.

Repeat for the other legs of the U-Bolts. The 5/8” jam nuts are tightened until (3) threads are visible past the bottom

of the jam nut.

of the jam nut.

15.

Torque the 5/8-11 GR5 fasteners connecting the rearward cross member to the brackets to 150 ft.-lb. (203 N-m).

16.

If the wire harness was loosened to install the rear driver’s side frame bracket u-bolt and cannot be reattached using

the existing fasteners, use the cable tie to attach the wires to the u-bolt.

17.

Reinstall the exhaust and raise the spare tire. Reattach the ground wire, through the large hole in the Driver’s side

frame bracket on 2010 and later model year vehicles.

z

2007, 2008, 2009, 2010 Cequent Performance Products

Sheet 8 of 8

4435N

1-12-10

Rev. J

Advertising