Backflush Kit Installation

Installations with high fouling potential will require plumbing in a pressurized surge tank and inlet solenoid

valve (See Flushing Schedule Table 1). In the backflush mode, the filtered water from a pressure tank flows

backward through the membrane from the filtrate side during the flushing cycle. This removes the foulant from the

membrane surface as well as material that may have entered into the porous structure.

Connect the FreshPoint™ to the plumbing supply as shown in Figure 2. It is recommended that the plumbing

include a system bypass for future servicing, etc. A 200 um sediment pre-filter is recommended. For ease of

membrane element replacement, unions are recommended as indicated on Figure 2. The backflush tank should

be installed on a tee before the flow meter. The backflush tank precharge pressure should be set to 20 psig.

NOTE: Installation of the backflush tank after the meter will cause reverse flow through the meter and

could have a detrimental effect on meter performance.

Installation Instructions

Figure 2: Backflush Kit Installation

Drain Flow Control

(Note Flow Direction)

Flow Meter Housing

(Note Flow Direction)

Drain

Piping Must

Include

Code-Compliant

Air Gap

1/4” Ball Valve Pressure Tap

for Membrane Integrity Testing

(Recommended)

Backflush Inlet Shut-Off Valve

Pre-filter (Recommended)

Inlet Valve

Bypass Valve

Inlet

Outlet

Outlet Valve

Tank Isolation Valve