5 installation, English, 4 overall dimensions – CAME Ferni 24v User Manual

Page 3: 1 preliminary checks

Advertising
background image

3

ENGLISH

T

h

e d

at

a a

n

d i

n

fo

rm

at

io

n s

h

ow

n i

n

t

h

is

m

an

u

al

m

ay b

e c

h

an

g

ed by CAM

E

c

an

ce

ll

i a

u

to

m

at

ic

i s

.p

.a

. a

t a

n

y t

im

e w

it

h

o

u

t p

ri

o

r w

ar

n

ing

.

4.4 Overall dimensions

Measurements in mm

Before installing, do the following:

• Make sure the structure of the gate is sturdy, the hinges work and that the is no friction between moving and non-moving parts;
• That measurement C is not greater than the value shown in Tab. 3, p. 4. In which case you need to work on the pillar until said

measurement is obtained;

• Make sure the path of the electrical cables complies with the command and safety instructions;
• That there is a (soundly secured to the ground) mechanical stop to prevent the gate leaf/gearmotor from over extending

.

You may perform internal back up circuit connections, provided you use additional insulation when compared to the other

internal live parts;
• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical
damage.

Installation must be carried out by expert qualified personnel and in full compliance with current regulations.

5 Installation

5.1 Preliminary checks

Pillar

Gate leaf

End stop

Hinge

182

340

16

8

* If distance B is 0 to 300 mm, distance A
must be at least 110 mm

If distance B is 300 to 380 mm, distance A
must be at least 150 mm

450

400

350

*A

*B

Advertising