Fusible link, Model fl-800 s and v – Cashco FL800 User Manual

Page 3

Advertising
background image

IOM-FL

3

FUSIBLE LINK

Barstock Thermal Shutoff Valves

MODEL FL-800 S and V

REFERENCE DATA:

FL-800 Series Assembly Drawing No. A66-60800-00, A66-60800-01, A66-60800-02 & A66-60800-03.

INSTALLATION:

1. Clean the piping of all foreign material including chips, welding scale, oil, grease and dirt before installing the thermal

trip valve.

2. In placing thread sealant on pipe ends prior to engagement, ensure that excess material is removed and not allowed

to enter the thermal trip valve upon startup.

3. Flow Direction: Install so the fl ow direction matches the fl ow arrow on the body of the thermal trip valve.

PRINCIPLE OF OPERATION:

1. When the valve is installed it is open.
2. This valve will stay open until it is actuated by the fusible link.
3. This will cause the valve to close.

MAINTENANCE:

1. All valves are leak tested at the factory at 450 psig and should be externally leak tight after installation. If after pro-

longed ser vice the valve should leak externally, it is recommended the valve be replaced or sent to the factory for
rebuilding.

Advertising
This manual is related to the following products: