Pb112, Installation instructions, Parts – Aube Technologies TH115 User Manual

Page 3: Guidelines, Procedure, Technical specifications

Advertising
background image

PB112

400-112-006-B 1/6/05 1/1

n

One (1) power base

o

Two (2) screws

p

Four (4) solderless connectors for copper wires

NOTE:

Special CO/ALR solderless connectors must be used for connecting

aluminum conductors.

q

One (1) floor sensor and one (1) flat tip screwdriver (F and AF floor
heating models only).

Turn off power to the heating system at the main electrical panel to
avoid electrical shock. The installation should be carried out by an elec-
trician.



High voltage thermostats must be installed onto an electrical box.



For a new installation, choose a location about 5 ft. above the floor and
on an inside wall.



The thermostat must be installed on an inside wall facing the heating
system (except for floor heating systems).



Avoid locations where there are air drafts (top of staircase, air outlet),
dead air spots (behind a door), direct sunlight or concealed chimneys or
stove pipes (except for floor heating systems).

n

Connect the power base wires to the power supply and load using sold-
erless connectors for copper wires (figure 1).

o

If your thermostat is type F or AF (not A), insert the floor sensor wires
through one of the two holes below the terminals (figure 2) and connect
the wires to terminals 3 and 4 (no polarity).
The wires must run alongside the terminals and not go over them. The
wire must not cross any heating wires nor be placed directly on a heating
wire or adjacent to it. For best performance, the sensor probe should be
centered between the wires in the mat.

p

If you wish to use a remote controller such as the CT240 or CT241,
insert the cable (use 18 to 22 gauge flexible wires) into one of the two
holes available below the terminal board and connect to terminals 1 and
2 of the base (figure 2).

q

Push the excess length of the high-voltage wires back into the electrical
box.

r

Secure the power base to the electrical box using the provided screws.

s

If necessary, set the configuration switches on the control module (refer
to the control module user guide).

t

Install the control module onto the base.

u

Apply power to heating system.

Storage

: -4°F to 120°F (-20°C to 50°C)

Remote controller input (ECONO)

: requires a dry contact

Size (H • W • D)

: 4.89 x 2.76 x 0.91 in. (124 x 70 x 23 mm)

Certifications

:

n

Parts

1.

o

Guidelines

2.

p

Procedure

3.

q

Technical Specifications

4.

Model

Supply

Max. Load

Power

Wiring

GFCI

120GA

120 VAC, 50/60Hz

15 A

1800 W

4w/DP

5 mA

120GB

120 VAC, 50/60Hz

15 A

1800 W

4w/DP

30 mA

120S

120 VAC, 50/60Hz

16.7 A

2000 W

4w/SP

240GA

240 VAC, 50/60Hz
208 VAC, 50/60Hz

15 A

3600 W
3120 W

4w/DP

5 mA

240GB

240 VAC, 50/60Hz
208 VAC, 50/60Hz

15 A

3600 W
3120 W

4w/DP

30 mA

240S

240 VAC, 50/60Hz
208 VAC, 50/60Hz

16.7 A

4000 W
3475 W

4w/SP

240D

240 VAC, 50/60Hz
208 VAC, 50/60Hz

15 A

3600 W
3120 W

4w/DP

Power

Load

Figure 1

Figure 2

Models:

120 GA / GB

240 GA / GB

Models:

120S / 240S
240D

PB112

Installation Instructions

For models: 120GA / 120GB / 120S / 240GA / 240GB / 240S / 240D

Advertising