Controlled Products Systems Group EL24100 User Manual

Direct burial installation instructions, Basic loop layout guidelines to follow

Advertising
background image

BD

Loops

|

5362 Bolsa Ave. unit C | Huntington Beach, CA 92649

P: 714 890-1604 | F:714 890-1603 | C: 714 334-6978 | E: [email protected] | www.

BD

Loops

.com

Direct Burial Installation Instructions*

Preformed direct burial installation tips and directions

This is not a Saw-Cut Loop

for all saw-cut applications use

BD

Loops

preformed 3/16” saw-cut loop.

Installation in

Concrete

See Reverse side of this page.

(Pictures included)

Installation Under

Pavers

If the sub-base is concrete or
a slurry do not use this loop.
Saw-Cut in a loop instead.


Determine loop position and
footprint to include lead-in run to
gate operator. Be sure to use the
correct loop size.

*


Dig a 2” wide by 3-4” deep
trench in the pattern of the loop
and lead-in. (See Figure 1)

Fill Trench with one inch of sand.

Place loop in trench and run
lead-in through

½” schedule 40

or 80 rigid PVC. Glue all PVC
joints with a

a proper PVC

solvent cement

.


Cover loop and lead-in PVC run
with 2½” of sand.





Installation under

Asphalt

Position and shape the loop on
sub-base. Be sure to use the
correct loop size.

*

Pull lead-in through ½

” schedule

40 or 80 rigid PVC. Glue all PVC
joints with a

a proper PVC

solvent cement

.


Dig a

2” wide by 3-4” deep trench

in the size and place of the loop
footprint and lead-in.

Fill the trench with one inch of
sand base.

Lay the loop and lead-in run in the
trench on top of sand base and
use supplied ground stakes to
secure the loop corners.

Cover loop and lead-in PVC run
with 2½

” of sand.

Installation in

Gravel Road

Position and shape the loop on
sub-base. Be sure to use the
correct loop size.

*

Pull lead-in through ½

” schedule

40 or 80 rigid PVC. Glue all PVC
joints with a

a proper PVC

solvent cement

.


Dig a 7

” to 10” deep trench in the

size and place of the loop
footprint and lead-in.

Fill the trench with one inch of
sand base.

Lay the loop and lead-in run in the
trench on top of sand base and
use supplied ground stakes to
secure the loop corners.

Cover loop and lead-in PVC run
with 2½

” of sand. Compact sand

around the loop then fill in with
road base.


Harness Wire: Solder all connections


Plug/Screw Connectors: Tint all connections

Basic loop layout guidelines to follow

Reverse and Exit Loops

4ft from the gate/door.

Swing gates require 3ft from its
complete open and closed position.

2ft from each curb.

4ft from every other loop.

Shadow loops

Loop lies under the swing path.

3-4ft from the gates in its complete open
and closed position.

0-2ft from the curb. (Single Swing Gate)

Detection height is determined by approximately 2/3 of the short leg of the loop. Residential 4ft short leg (Detection of standard size

vehicles only).

Commercial 6ft short leg (Detect higher bed vehicles).

*Check BDLoops.com for the latest installation instructions

Loop should

be encased in

sand.

Soil

Loop

Sand

Figure 1

The ground stakes included with the loop are to help
hold the loop down while laying out a trench pattern.
When the loop is placed in the trench the ground stakes
are no longer necessary and should be discarded.

BD Loops

cannot

come in direct

contact with hot asphalt.

Call BD Loops for any questions

and to find a solution.

Advertising
This manual is related to the following products: