Mvm8900 pump rebuild kit, For replacement of schrader valve (16) – Mityvac MVM8900 Pump Rebuild Kit User Manual

Page 2

Advertising
background image

Page Number - 2

Form 801519

MVM8900

Pump Rebuild Kit

Americas:

One Lincoln Way

St. Louis, MO 63120-1578

USA

Phone +1.314.679.4200

Fax +1.800.424.5359

Europe /Africa/Middle East

Lincoln GmbH

Heinrich-Hertz-Str. 2-8

69190 Walldorf - Germany

Phone/Fax +49.6227.33-0/-259

www.lincolnindustrial.de

Asia/Pacific:

51 Changi Business Park

Central 2

#09-06 The Signature

Singapore 486066

Phone +65.6588.0188

Fax +65.6588.3438

© Copyright Lincoln Industrial

Corporation 2009

Printed in China

Web site:

www.lincolnindustrial.com

23. Install the new Umbrella Valve (6) onto the

Front Seal Retainer by inserting the stem

through the center hole of the Front Seal Re-

tainer. Be sure the stem extends forward.

24. Trim approximately 1/4 inch off of the umbrella

valve stem.

25. Install the Front Seal Retainer assembly into

the front of the Pump Body cylinder.

26. Remove the Duckbill Valve (13) from the Valve

Housing and install new.

27. Remove the Valve Housing O-ring (14) from the

Valve Housing and install new.

28. Install the Valve Housing onto the Pump Body.

29. Lightly lubricate the three new Dual Converter

Valve O-rings (15), and install them onto the

new Dual Converter Valve (3).

30. Carefully slide the Dual Converter Valve

Assembly into the Valve Housing with the stem

extending through the valve housing.

31. Properly align the Dual Converter Knob (2) with

the notch on the end of the Dual Converter

Valve stem, and install the knob. Secure it with

the Dual Converter Knob Screw (1)

For replacement of Schrader Valve (16)

1. Remove the Lever Pin Retaining Ring, Lever

Pin, and Release Lever

2. Use the Schrader Valve Tool (17) to unthread

and remove the Schrader Valve (16)

3. Install the new Schrader Valve (16) using the

Schrader Valve Tool (17).

4. Reinstall Release Lever, Lever Pin and Lever Pin

Retaining Ring.

Advertising