1 pre-installation checklist, 2 wiring the unit – Alpha Technologies 1000 Series User Manual

Page 16

Advertising
background image

2 Installation

10

Alpha Technologies

2.1

Pre-Installation Checklist

Placement

The Pinnacle Plus is an indoor unit. Install it in a dry, dust-free, well-ventilated area with a
temperature of between 60°F to 77°F (15°C to 25°C). Place it on a flat, level surface that
will support its weight (up to 73 lbs, (33 kg)).

The front panel must be easily accessible to the operator.

Do not block the unit’s ventilation slots or the fans. There must be at least 4 inches (100 mm)
between the rear panel and the wall and 2 inches (50 mm) between the walls and the side
panels.

Utility Circuit Breaker

Wire the unit to a dedicated circuit equipped with a circuit breaker. See Section 3.7 for
the unit’s input specifications. All wiring should meet the National Electrical Code ANSI/
NFPA 70.

Grounding

Older facilities may have improper grounding. A qualified electrician should inspect it before
installation to see that it meets the local electrical code.

Adding New Equipment

Shut down the unit (Section 3.1) and then disconnect the line cord before adding any new
loads, battery packs or other equipment.

2.2 Wiring the Unit

Procedure:

1

Connect the load(s) to the unit’s output connector(s) (Figure 2.1).

2

Connect RS–232 or other communications, emergency power off switch, battery packs or

any other options (Sections 2.3 to 2.6).

3

Connect the line to the unit’s input connector.

TIP: Determine what output voltage you are using. When starting the unit for the first
time, see if you need to configure the unit’s output voltage (Section 3.4).

Wiring Finished

Turn on the unit as described in Section 3.1.