PERKO 1318 User Manual

Drill for #10 screws (4), 1/16” dia, Mounting template

Advertising
background image

Cat. Nos. 1318 Series Combination Fill/Vents

Installation and Operation Instructions

1. Select mounting location:

- In accordance with A.B.Y.C., U.S. Coast Guard and E.P.A. requirements and regulations.
- Surface must be flat and provide adequate clearance to remove the cap.
- Allow for adequate clearance under fill for routing fill and vent hose, which must be selected and installed in

accordance with A.B.Y.C. requirements and U.S. Coast Guard Safety Standards for Small Boat Fuel Systems
(33 CFR 183).

-- C

CO

ON

NS

SIID

DE

ER

R T

TH

HE

E L

LIIM

MIIT

TA

AT

TIIO

ON

NS

S O

OF

F A

A M

MA

AR

RIIN

NE

E F

FU

UE

EL

L V

VE

EN

NT

T::

A

A))

D

DO

O N

NO

OT

T L

LO

OC

CA

AT

TE

E O

ON

N A

A S

SU

UR

RF

FA

AC

CE

E T

TH

HA

AT

T C

CA

AN

N B

BE

EC

CO

OM

ME

E S

SU

UB

BS

ST

TA

AN

NT

TIIA

AL

LL

LY

Y S

SU

UB

BM

ME

ER

RG

GE

ED

D O

OR

R

F

FL

LO

OO

OD

DE

ED

D,, O

OT

TH

HE

ER

RW

WIIS

SE

E W

WA

AT

TE

ER

R C

CA

AN

N B

BE

E D

DR

RA

AW

WN

N IIN

NT

TO

O T

TH

HE

E S

SY

YS

ST

TE

EM

M D

DU

UR

RIIN

NG

G V

VE

EN

NT

T

O

OP

PE

ER

RA

AT

TIIO

ON

N..

B

B))

A

AC

CC

CO

OM

MO

OD

DA

AT

TE

E F

FU

UG

GIIT

TIIV

VE

E L

LIIQ

QU

UIID

D F

FU

UE

EL

L E

EM

MIIS

SS

SIIO

ON

NS

S T

TH

HA

AT

T R

RE

ES

SU

UL

LT

T F

FR

RO

OM

M

IIN

N--T

TA

AN

NK

K F

FU

UE

EL

L S

SU

UR

RG

GE

ES

S..

2. Non-metallic fills do not need to be grounded or bonded.

3. Attach mounting template to selected mounting surface and orient for desired position of fill/vent connections and

for ease of insertion of the fuel nozzle into the neck. Drill where indicated, drilling the 3/4 inch hole first.

NOTE: The 2-1/16” dimension of the larger hole is sized to provide mounting surface support to fill the

body. DO NOT use larger size cutter or drill.

4. Mount fill using #10 Round head or Pan head screws. Caulk if necessary.

5. Attach and clamp fill and vent hoses, also in accordance with the above referenced

requirements.

6. The vent system requires that the surge valve feels loose in order to operate properly. Unscrew

collar to remove surge valve and access flame arrestor screen for cleaning.

(1). American Boat & Yacht Council, Inc. (2). U.S. Coast Guard (3). E.P.A.

3069 Solomon’s Island Road

Washington,D.C.20593 401”M” Street S.W.

Edgewater, Maryland 21037

(or you local C.G. office) Washington, D.C. 20460

3/02

1318INS1

Drill for #10 Screws (4)

Drill 3/4” Dia. Hole
(Drill First)

2-1/16” Dia.

Hing

e Side

PERKO, INC.
16490 N.W. 13th Avenue
Miami, FL 33169-5707
www.perko.com

PERKO, INC.
16490 N.W. 13th Avenue
Miami, FL 33169-5707
www.perko.com

1-7/32”

MOUNTING TEMPLATE

Cat. Nos. 1318 Series Combination Fill/Vents

Installation and Operation Instructions

1. Select mounting location:

- In accordance with A.B.Y.C., U.S. Coast Guard and E.P.A. requirements and regulations.
- Surface must be flat and provide adequate clearance to remove the cap.
- Allow for adequate clearance under fill for routing fill and vent hose, which must be selected and installed in

accordance with A.B.Y.C. requirements and U.S. Coast Guard Safety Standards for Small Boat Fuel Systems
(33 CFR 183).

-- C

CO

ON

NS

SIID

DE

ER

R T

TH

HE

E L

LIIM

MIIT

TA

AT

TIIO

ON

NS

S O

OF

F A

A M

MA

AR

RIIN

NE

E F

FU

UE

EL

L V

VE

EN

NT

T::

A

A))

D

DO

O N

NO

OT

T L

LO

OC

CA

AT

TE

E O

ON

N A

A S

SU

UR

RF

FA

AC

CE

E T

TH

HA

AT

T C

CA

AN

N B

BE

EC

CO

OM

ME

E S

SU

UB

BS

ST

TA

AN

NT

TIIA

AL

LL

LY

Y S

SU

UB

BM

ME

ER

RG

GE

ED

D O

OR

R

F

FL

LO

OO

OD

DE

ED

D,, O

OT

TH

HE

ER

RW

WIIS

SE

E W

WA

AT

TE

ER

R C

CA

AN

N B

BE

E D

DR

RA

AW

WN

N IIN

NT

TO

O T

TH

HE

E S

SY

YS

ST

TE

EM

M D

DU

UR

RIIN

NG

G V

VE

EN

NT

T

O

OP

PE

ER

RA

AT

TIIO

ON

N..

B

B))

A

AC

CC

CO

OM

MO

OD

DA

AT

TE

E F

FU

UG

GIIT

TIIV

VE

E L

LIIQ

QU

UIID

D F

FU

UE

EL

L E

EM

MIIS

SS

SIIO

ON

NS

S T

TH

HA

AT

T R

RE

ES

SU

UL

LT

T F

FR

RO

OM

M

IIN

N--T

TA

AN

NK

K F

FU

UE

EL

L S

SU

UR

RG

GE

ES

S..

2. Non-metallic fills do not need to be grounded or bonded.

3. Attach mounting template to selected mounting surface and orient for desired position of fill/vent connections and

for ease of insertion of the fuel nozzle into the neck. Drill where indicated, drilling the 3/4 inch hole first.

NOTE: The 2-1/16” dimension of the larger hole is sized to provide mounting surface support to fill the

body. DO NOT use larger size cutter or drill.

4. Mount fill using #10 Round head or Pan head screws. Caulk if necessary.

5. Attach and clamp fill and vent hoses, also in accordance with the above referenced

requirements.

6. The vent system requires that the surge valve feels loose in order to operate properly. Unscrew

collar to remove surge valve and access flame arrestor screen for cleaning.

(1). American Boat & Yacht Council, Inc. (2). U.S. Coast Guard (3). E.P.A.

3069 Solomon’s Island Road

Washington,D.C.20593 401”M” Street S.W.

Edgewater, Maryland 21037

(or you local C.G. office) Washington, D.C. 20460

3/02

1318INS1

Drill for #10 Screws (4)

Drill 3/4” Dia. Hole
(Drill First)

2-1/16” Dia.

Hing

e Side

1-7/32”

MOUNTING TEMPLATE

Advertising