Adjustments, Adjust lip function – Poweramp HED SERIES HYDRAULIC User Manual

Page 36

Advertising
background image

34

Manual No. 4111-0027

Sept. 2009

May 2012

34

ADJUSTMENTS

Adjust Lip Function

1. Raise platform fully and engage the maintenance

prop in the service position. Allow platform to rest

on the prop so the lip will fully fold until it contacts

the lip stops.

2. Turn OFF all electrical power to the dock leveler.

Attach safety lockout and tagout devices.

When service under the dock leveler is required,

always lock all electrical disconnects in the OFF

position after raising the platform and engaging the

maintenance prop. Failure to do this may result in

serious personal injury or death.

Always post safety warnings and barricade the

work area at dock level and ground level to prevent

unauthorized use of the dock leveler before

maintenance is complete. Failure to do this may

result in serious personal injury or death.

Always stand clear of the dock leveler lip when

working in front of the dock leveler.

The maintenance prop MUST be in the service

position when working under the dock leveler.

For maximum protection, use an OSHA approved

locking device to lock the maintenance prop in

the service position. Only the person servicing

the equipment should have the key to unlock the

maintenance prop.

Unless the dock leveler is equipped with a tethered

remote, two people are required to engage the

maintenance prop: one person to operate the unit,

the other person to engage the maintenance prop.

Failure to follow these instructions may result in

serious personal injury or death.

Notes:

1. Relief valve is factory set at 1500 PSI. This valve is

main system relief.

2. Relief valve adjustment:

• Loosen jam nut.

• Turn screw clockwise to increase pressure.

• Turn screw counter clockwise to decrease

pressure.

• Tighten jam nut.

3. Sequence valve is factory set at 750 PSI. Turn

clockwise to increase pressure, turn counter

clockwise to decrease pressure. This valve

normally should not need adjustment.

4. See trouble shooting section for further adjustment

procedures.

Troubleshooting:

1. If lip opens as platform begins to rise, turn sequence

valve clockwise in 1/4 turn increments.

2. If lip will not fully retract when recycling platform to

stored position, turn sequence valve clockwise in

1/8 turn increments.

Note: All adjustments should be made in small

increments, and should be charted to have reliable

information when back tracking through adjustments.

Advertising