Installation, Detail a – Fulton Vantage (VTG) Fully Condensing Hydronic Boiler User Manual

Page 18

Advertising
background image

© The Fulton Companies 2013

INSTALLATION

VTG-IOM-2013-0815

SECTION 2

2-12

FIGURE 5 - CONDENSATE DRAIN PIPING FOR VANTAGE BOILERS

Figure 5 Notes:

 Header must be level or slightly pitched toward the drain.

 Header material to be galvanized steel or 316L stainless.

 Header should be taken to the lowest point possible and

at least 5.5 inch (14.2 cm) drop from 1.5 inch (38.1 mm)
condensate drain kit/trap outlet.

 1.5 inch (38.1 mm) condensate drain kit/trap outlet is never

to be above 1 inch boiler condensate outlet.

 For multiple boiler installation, maintain and minimum pipe

size of 1 inch (25.4 mm) for the header piping.

 The maximum number of units to attach per condensate

drain kit is 12mm BTU total.

Detail A

0.25” (U.S.) TAPPING
PROVIDED FOR WATER
CONNECTION TO MAINTAIN
WATER SEAL

5.5 INCH (14.2 CM)
MINIMUM

SIDE VIEW

Detail A

(condensate drain kit)