Earthway 2150T Commercial Tow Broadcast Spreader User Manual

Page 4

Advertising
background image

GAUGE & LEVER

ASSEMBLY

Control Rod

Tabbed Hole

Control Rod

Lever Tensioning Nut

Gauge Setting

Overlay

14. Install (1) 1/4-20 regular hex nut

(not a locknut) on to control rod as

shown.

15. Install flattened end of control rod in to lever on gauge as shown. Turn to lock

in place. Next push lever forward to setting “0”. Align control rod with hole

in pivot bracket, pull lever backward to insert control rod through hole in pivot

bracket. Now install 1/4-20 regular nut on to control rod.

16. Pull lever back to setting “30” as shown. Next push pivot & bracket forward so that the shut off plate in the hopper is in the full open

position. REMEMBER SETTING “30” ON THE FLOW CONTROL LEVER MUST PLACE THE SHUT-OFF PLATE IN THE FULL

OPEN POSITION TO BE PROPERLY CALIBRATED. Now tighten the nuts against the pivot bracket to prevent change in calibration.

17. Tension on the flow control lever may be adjusted by tightening or loosening the tension nut as shown.

¼-20

Hex Nuts

Pivot

Bracket

Control

Rod

Pivot

Rod

18. Insert agitator to pinion shaft on inside of hopper. Note: the position of flat

side of the agitator. This pin should be installed as shown.

PAGE 4

Advertising