Kez series, General pump – General Pump KFM Repair Manual User Manual

Page 13

Advertising
background image

GENERAL PUMP

A member of the Interpump Group

KEZ SERIES

Page 13

13. SCREW CALIBRATION

Description

Exploded View

Position

Material

Fastening Torque

(ft. lbs.)

Fastening Torque

(Nm)

Cover fastening screws

9

8.8

7

10

Plunger fastening screws

54

AISI 416

15

20

Connecting rod caps

fastening screws

18

12 R

28*

38*

Head fastening nut

45

8.8

59**

80**

Head fastening screws

48

8.8

59**

80**

Valve cover screws

29

12.9

89***

120***

Lifting bracket fastening screws

17

8.8

74

100

Oil Discharge plug

11

Plated Brass

30

40

Delivery duct plug

42

AISI 316L

30

40

* The connecting rod caps fastening screws must be tightened respecting the phases indicated in “Point D”

of page 6.

** The head screws and nuts, exploded view position 45 and 48, must be fastened using a torque wrench,

lubricating the threaded stem, respecting the order shown in the scheme in fig. 21

*** The valve cover screws, exploded position 29, must be fastened using a torque wrench, lubricating

the threaded stem, respecting the order shown in the schematic in fig. 21.

fig. 21

Advertising