Kfz series, General pump – General Pump KFZ Repair Manual User Manual
Page 13
![background image](/manuals/347267/13/background.png)
GENERAL PUMP
A member of the Interpump Group
KFZ SERIES
Page 13
13. SCREW CALIBRATION
Description
Exploded View
Position
Fastening Torque
(ft. lbs.)
Fastening Torque
(Nm)
Cover fastening screws
9
7
10
Plunger fastening screws
29
15
20
Connecting rod caps
fastening screws
16
28*
38*
Head fastening screws
37
44**
60**
Valve cover screws
38
44***
60***
Lifting bracket fastening screws
58
74
100
Oil Discharge plug
11
30
40
Delivery duct plug
11
30
40
* The connecting rod caps fastening screws must be tightened respecting the phases indicated in “Point D”
of page 6.
** The head screws and nuts, exploded view position 45 and 48, must be fastened using a torque wrench,
lubricating the threaded stem, respecting the order shown in the scheme in fig. 21
*** The valve cover screws, exploded position 29, must be fastened using a torque wrench, lubricating
the threaded stem, respecting the order shown in the schematic in fig. 21.
fig. 21