Hauler Racks Universal Steel Van Rack (SV2-1) User Manual

Page 5

Advertising
background image

5 of 7

HAULER RACKS, INC.
7109 31

st

Avenue North

Minneapolis, MN 55427-2848
WWW.HAULERRACKS.COM

Toll Free: 1-800-843-5445

Phone: 763-546-5620

Fax: 763-546-0933

Step 5 Crossbar assembly

Slide the crossbar subassembly with the 1-1/2” square tube into the crossbar assembly with the 1-3/4” square tube as
shown.

Repeat for other crossbar.

Step 6

Place the crossbars on desired location on van and adjust width to fit gutter.

Tighten clip hardware on both sides.

Using the 1-3/4” tube bolt holes as guides; mark the holes onto both sides of the 1-1/2” tubes.

Loosen clips and remove the crossbars from van.


Step 7

Slide out 1-1/2” tube from the 1-3/4” tube.

Mark the center of the holes on the 1-1/2” tube from step 6.

Using a 3/8” drill bit, drill each holes from the outside in.

Repeat for other crossbar.

Advertising