Attach post caps, Fixing first rail, Extending the post – Keter Dallas 6 User Manual

Page 2

Advertising
background image

12”-20”

(30cm-50cm)

2”

This side up

2” (5cm)

(5cm)

PP GLUE

GROUND

2nd p

ost

GROUND

2nd p

ost

2”-6” (5cm-15cm)

2”-6” (5cm-15cm)

option 1

?

ATTACH POST CAPS.

1.

Press caps down on post top.

2. you can secure the caps with super glue

7

6

FIXING FIRST RAIL

1

2

3

Make sure the rail is leveled horizontly &90 to the second post

1. Place the lower rail in position.

2. Fix the rail to the post with 2 screws (SC35B), through the

bracket holes.

3. level the rail horizontely use a timber to support.

11

INSTALLING FENCE SECTION

Position the brackets on the empty side (In continuation direction) of the post considering the 3 following

options: folow

Level

Downward slope

Upward slope

2” -6”

(5cm-15cm)

place the positioning guide from top of the post & fix the brakets 3 screw (sc15) for each.

2nd p

ost

2nd p

ost

GROUND

GROUND

6”-12” (5cm-15cm)

6”-12” (5cm-15cm)

?

option 2

6”

(15cm)

And up, place the lower bracket 2”

(5cm)

from ground use positioning guide for the second

bracket.

If the distance is more then 12”

you must extend the post

8

FIXING NEXT POST (Take into account level, downward and upward slopes)

up

90

o

90

o

1

2

3

4

12”-20”

(30cm-50cm)

GROUND

EXTENDING THE POST

The post must be at least 12” In ground if you have a slope that is over 12” you

must extend

the post with timber as showen.

(use 4”/4”/24”,10cm/10cm/65cm timber 8 screw)

1. Attach two brackets to the post using the positioning guide.

2. place the post in the hole

3. Fix the post to the rail with 2 screws (SC35B) , through the bracket holes.

4. Add Concrete use dry or mix concrete. Allow concrete to set for 10-15 minutes.

Verify that rail is leveled and post is vertical on both direction !

X2

1

2

SCREW FROM

BOTH SIDES

Assemble the upper rail on

top of the panel.

Use two screws to fix the rail

to the bracket

INSTALLING FENCE SECTION

10

1

2

1. Assemble the first panel into

the bottom rail.

2. Make sure the panel goes into

the brackets.

?

option 3

GROUND

In the case of upward slope, connect the brackets 2”

(5cm)

up and/or position the new post

lower while digging a trench for the rail .

Make sure (using the positioning guide) that upper bracket on the left side is not out of the post top.

2nd p

ost

GROUND

3th p

ost

2nd p

ost

GROUND

3th p

ost

9

Advertising