Reese 5AS16K 5TH AIRBORNE SIDEWINDER User Manual

Installation instructions, Airborne sidewinder, Part numbers

Advertising
background image

Installation Instructions

5

th

Airborne Sidewinder

Part Numbers:

5AS16K

PIN BOX SHOWN ASSEMBLED

Equipment Required:

Wrenches: 15/16”, 3/4”, 9/16” &

TORQUE WRENCH

INDEX

1. GUIDELINES FOR MATCHING TOW VEHICLE AND TRAILER P. 2

2. ASSEMBLY INSTRUCTIONS

P. 4

3. OPERATING INSTRUCTIONS P. 6

4. HITCHING PROCEDURE P. 9

5. PULL TEST P. 10

6. ADJUSTING THE AIR SPRING P. 11

7. UNHOOKING PROCEDURE P. 12

8. 5 YEAR LIMITED WARRANTY P. 13

z

2009 Cequent Performance Products - Printed in Mexico

Sheet 1 of 13

5AS16KIN

11-8-11

Rev. E

1

Qty. (1)

Air Spring

2

Qty. (1)

Air Line Fill

3

Qty. (2)

Shock Bolt (1/2-

13 X 3.75”)

4

Qty. (2)

½-13 Nylon Lock Nut

5

Qty. (1)

Shock

6

Qty. (2)

3/8-16 x 1 GR5 Bolt

7

Qty. (2)

3/8” Conical Washer

8

Qty. (2)

3/8-16x1.5 GR5 Bolt

9

Qty. (1)

Pivot Shaft

10

Qty. (2)

Special Washer

Qty. (2)

Star Washer

Qty. (2)

½ -13 x 1.25 GR 5 Bolt

Qty. (2)

3/8” Flat Washer

14

Qty. (1)

Universal Wedge*

15

Qty. (2)

5/8 Lock Washer

16

Qty. (2)

Bolt, 5/8

– 11 x 1 ¾ Grd. 5 Hex Head

17

Qty. (1)

Wear Plate

18

Qty. (1)

Top Cap Plate

Do Not Exceed Lower of Towing Vehicle Manufacturer’s Rating,

Trailer Manufacturer’s Rating or

Max Gross

Trailer WT (LB)

Max Pin

WT (LB)

16,000 LB

3,200 LB

Form: F205 Rev A 5-6-05

DEALER/INSTALLER:

(1) Provide this Manual to end user

END USER:

(1) Read and follow this Manual every time you use this product.

(2) Save this Manual for Future Reference.

(3) Pass on copies of Manual to any other users or owner.

11

12

1

2

3

4

6

5

9

7

8

11

12

10

WARNING:

Failure to follow all of these instructions may result in death or serious injury!

Figure 1

17

13

13

18

14*

15

16

*Custom Wedges are available for most fifth wheel hitch applications,
to order a custom wedge kit, see your RV Dealer or contact CPP
Technical Service: 1-888-521-0510

Advertising