Set-Up Instructions

INSTALLING THE TANK

The new tank comes with a dry nitrogen charge of 10 to 15 psi (4.9 to 7.4 bar) to
keep it clean and dry during shipment. To install the new tank, you will need to:

1. Purge its nitrogen charge by opening either valve on the tank, vent the pressure

to the atmosphere, then close the valve.

2. Place the unit tank on the scale platform on the back of the unit (see illustration

on page 5 for location). Then attach the tank strap to the tank handle.

3. Attach the temperature probe at the approximate location shown below.

CAUTION!

Some tanks have slightly different valve configurations. Be sure to

connect the VAPOR hose to the GAS (vapor) valve and connect the LIQUID hose to
the LIQUID valve.