Salamander Designs Synergy System 703C/B User Manual

Synergy solutions 703 instructions

Advertising
background image

Synergy Solutions 703 Instructions

1

2

3

4

5

5. Finish Assembly of base unit.

Insert side panel (a)

Car

efully slide side panels down center channel of outside posts. Make sure the posts are

square to the bottom shelf to prevent any damage to the side panels when inserted.

Adjust Shelf Pegs and Add Shelf (b)

Use the bubble level to precisely adjust the shelves. Be sure to level both side to side as well as

front to back. Use the hex key to tighten each shelf peg.

Add Top Shelf (c)

After all shelf pegs are installed, align the top shelf holes over the tops of the posts.

a.

b.

c.

Salamander Designs Ltd. 800-535-5659

www .salamanderdesigns.com

6. Add extension and finish assembly

Add threaded studs (a)

Scr

ew the double ended threaded studs into the ends of the extruded posts, tighten with

wrench. Add felt pads to the underside of the posts; peel of

f backing and slide over stud

attaching to underside of post. This will prevent marring the surface of the existing top shelf.

Attach posts (b)

Scr

ew the extension posts into existing base securing the shelf to the rack. Finish attaching the

extension posts to the base unit. Be sure to square the posts with the shelf. Do not over tighten.

Repeat steps 2-5 (c)

Continue assembly of extension by repeating steps 2-5 with the elements of the extension.

Add Top Shelf (d)

After all shelf pegs,hinges, side and rear panels are installed, align the top shelf holes over

the tops of the posts. Insert the four socket head bolts and tighten.

Felt

Pad

a.

b.

c.

d.

Advertising