Attach rear panels, Final assembly, Soft close – Salamander Designs Synergy System 245C/B User Manual

Page 4

Advertising
background image

A

.

Insert Hardware

Combine the 1” threaded studs with the flat nuts.
Slide 2 sets of hardware down the two outside
posts and 4 sets down the three center posts.
Allow studs to remain loose at bottom of post.

B

.

Position & Secure Studs

Align the Spacer Tool at the top of each post, then
position top studs through the small “Rear Panel”
hole. Repeat this step with the bottom studs
aligning the Tool along the bottom of post to
set spacing for cable passage.

Use the hex key

to secure the top and bottom studs to the posts.

C

.

Place Rear Panels

Secure each panel in place with thumb nuts.

2X

4X

4X

2X

4X

REAR

Attach Rear Panels

A

.

Placing & Adjusting Shelves

Place shelves from the bottom up. Angle the
shelf in between the front post and set on top
of shelf pegs. Use the Spacer Tool to adjust
spacing between shelves. Position the peg
through the Spacer and tighten.

5

Final Assembly

4

Doc No. 501-090/v10.12 245 -4 of 4

C

.

Insert Side Panels

Carefully slide side panels down center
channel of outside posts. Be sure the
posts are square to the bottom shelf to
prevent any damage to side panels.

B

.

Fine Tuning

Use the bubble level to precisely adjust
the shelves. Be sure to level both sides
as well as front to back. Use the hex
key to tighten each peg.

D

.

Secure Top

Secure top with the 8 connector bolts to
complete installation.

A

B

SOFT

CLOSE

INSTALLATION

D E F I N I N G O R I G I N A L

D E F I N I N G O R I G I N A L

D E F I N I N G O R I G I N A L™

Logomark

Logotype

Tagline

Rule

SLOW CLOSE

FAST CLOSE

Advertising