Reading the charging status led, Battery setup, Battery replacement – SKC DCS (Deployable Cartridge Sampler) System User Manual

Page 11

Advertising
background image

8

batt ery from charger and connect pump to batt ery (see Batt ery Setup below).

Aft er charging the batt ery pack, it is good practice to run the pump for
approximately 5 minutes before calibrating. This ensures the batt ery is
in more steady-state conditions and improves the agreement in pre and
post-sampling calibrations.

Reading the Charging Status LED

The Li-Ion Charging Unit indicates batt ery charge
status via an LED on the unit that blinks in specifi c
patt erns. Observe the LED steadily for > 5 seconds
to read charge status.

LED Action

Charge Status

ON

Ò

steady

Charge in progress

ON

Ò

2 sec

OFF

{

.25 sec

ON

Ò

2 sec

(Repeats)

Approximately

80% charged

OFF

{

2 sec

ON

Ò

.25 sec

OFF

{

2 sec

(Repeats)

Charge completed

Battery Setup

1. Insert the plug on connecting cable from pump

into the jack on the batt ery adapter (on top of
the external batt ery assembly).

2. Insert external batt ery assembly into a foam

compartment in the case. Ensure there is no
tension on the connecting cable.

Battery Replacement

1. Record all necessary data before unplugging pump from batt ery.

2. Remove plug on connecting cable from jack on batt ery adapter (on top of

the external batt ery assembly).

3. Insert plug on connecting cable into batt ery adapter jack on new, fully

charged external batt ery assembly.

4. Insert external batt ery assembly into foam compartment in case. Ensure

there is no tension on the connecting cable.

Power supply jack

Charge status LED

For more information on SKC pump batteries, go to http://www.skcinc.
com/instructions/1756.pdf.

1

Connecting cable

External battery

assembly