OPERATION

F-4145 01/11

Operation Section 4-6

© 2011 Alamo Group Inc.

OPERA

T

ION

When on the side of a steep slope, cut a level surface

along the uphill side of the trench with the loader.

Pile the spoil of the cut downhill. When digging, pile the

spoil of the trench uphill.

Dig field trenches progressively. As soon as one trench is

completed, have the work men lay the tile. Start the next

trench, using the spoil to fill the previous trench.

MISCELLANEOUS

When finishing straight walls or bell holes in sandy soil, use

a platform under the rear tires and stabilizers. The platform

distributes the load over a larger area and lessens the

possibility of a cave-in. The platform also tends to keep the

unit from creeping rearward if hard digging is encountered.

FINISHING STRAIGHT WALLS

Finish the far wall by crowding out while forcing the bucket

down with the bottom. Actuate the bucket (curl out) to keep

the bottom of the bucket vertical.