Step 2 - adjusting pipe length, Step 3 - fit sampling pipe to sdp-2, Step 4 - drill hole in duct – Hochiki SDP-2 User Manual

Page 2: Step 5 - mounting the sdp-2 on the duct

Advertising
background image

Hochiki Europe (UK) Limited

Page 2 of 4

2-3-0-456/ISS5/FEB09

STEP2 - Adjusting Pipe Length

‰

After measuring the diameter of the duct and
deducing the length of pipe required, shorten the
pipe if necessary. The pipe should penetrate a
minimum of 90% of the width of the duct.

‰

Do not cut the end of the pipe with warning label.

‰

Only cut between sampling holes.

‰

Once cut to length, insert the end plug.

Large Diameter Ducts
When using a sampling pipe within a duct greater than
600mm diameter the pipe should penetrate the whole
duct:

‰

Shorten the pipe to correct length if
required

‰

Insert the end plug

‰

Fit the end plastic gasket

‰

Fit the rubber gasket

STEP3 - Fit Sampling Pipe to SDP-2

Before fitting the pipe to the unit, remove the cover and
the air-flow block. With the sampling pipe cut to length,
fit it to the underside of the SDP-2 unit:

‰

Mount the gasket (A) on to the pipe the correct way
round (see below)

‰

Push the pipe into the hole in the underside of the
unit (the pipe is specially shaped to only fit the
correct way round).

‰

Tighten the locking screw to secure the pipe to the
unit.

STEP4 - Drill Hole in Duct

Before mounting the SDP-2, drill a hole in the duct for
the sampling pipe:

‰

Without bracket - hole diameter = 35mm

‰

With bracket - hole diameter = 48mm (see “Using
the Optional Mounting Bracket” on page 4).

STEP5 - Mounting the SDP-2 on the Duct

‰

Carefully mount the SDP-2, inserting the sampling
pipe into the hole in the duct wall.

‰

Secure the SDP-2 with the supplied three 25mm
Self-tapping screws (positions shown).

Advertising