LA STEELCRAFT FLP-20 User Manual

Steelcraft products, Surface mounted, In-ground installation instructions

Advertising
background image

20'-0"

4'-0"

8'-0"

FOUL POLE

DATE: 6/23/09

DRAWN BY: AFS

DO NOT SCALE DRAWING

STEELCRAFT PRODUCTS

P.O. Box 90365 - Pasadena, CA 91103
PHN 626-798-7401 FAX 626-798-1482

MODEL

FLP-20

SHEET

NOTE: SPECIFICATIONS ARE SUBJECT TO CHANGE

SURFACE MOUNTED

USING THE CLIPS (4) AND BOLTS (3) .

5. TIGHTEN ALL BOLTS AND SET SCREWS.

IN-GROUND INSTALLATION INSTRUCTIONS:

1. DIG FOOTING AT PROPER LOCATION

30" DIA. X 60" DEEP

2. PLACE POST (1) INTO FOOTING AND SUPPORT

IN A PLUMB CONDITION WITH THE OUTSIDE

EDGE OF PIPE TANGENT TO THE OUTSIDE OF

THE FOUL LINE AND CLIPS TOWARDS THE

PLAYING FIELD. TOP OF POST TO BE 20'-0"

ABOVE FINISHED GRADE.

3. POUR CONCRETE AND WAIT 37 HOURS.

4. INSTALL THE PANELS TO THE TOP POST (1)

AVAILABLE

1 OF 1

(SUPPLIED BY OTHERS)

CONC. FOOTING

1

2

4

FINISHED GRADE

30"DIA. X 60" DEEP

ANTI-ROTATIONAL

PLATES

STEEL PLATE

FLP-20SM

SURFACE MOUNT DETAIL

16" X 16" X 1"

1" DIA. HOLES

ITEM QTY. PART

NO

DESCRIPTION

1

1

F04FP04B

4-1/2" OD Sch 40 POST @ 24'

2

2

F02FP000

SCREEN

3

8

P01FP000

BOLT/WASH/NUT (3/8" X 2-1/4")

4

1

F02FP001

CLIPS w / BOLTS (3/8" X 1-3/4")

Advertising