LA STEELCRAFT BBC-30Z User Manual

Steelcraft products, Sheet, Model elevation view

Advertising
background image

12"

SHEET

DATE: 10/25/05 DRAWN BY: AFS

DO NOT SCALE DRAWING

STEELCRAFT PRODUCTS

PHN 626-798-7401 FAX 626-798-1482

P.O. Box 90365 - Pasadena, CA 91103

MODEL

ELEVATION VIEW

Z-SHAPED

BBC-30Z

BALANCE BEAM

1 of 1

ASSEMBLY INSTRUCTIONS:

1. LAY BEAM ON THE GROUND AT THE INSTALLATION SITE AND MARK THE POSITIONS FOR THE

FOOTINGS. DIG SIX FOOTING HOLE 10" DIA. X 16" DEEP.

2. PLACE BEAM IN THE FOOTING HOLES WITH THE TOP OF BEAM AT 12" ABOVE FINISHED

GRADE. SUPPORT IN A LEVEL AND PLUMB POSITION.

3. POUR CONCRETE IN THE FOOTINGS TO A LEVEL OF 6" BELOW FINISHED GRADE. ALLOW

CONCRETE TO SET FOR 48 HOURS BEFORE REMOVING THE TEMPORARY BRACING.

FINISH GRADE

SURFACE

CONCRETE

FOOTING (TYP. OF 6)

10" DIA. X 16" DEEP

6" ATTENUATING

2-3/8" OD PIPE

SURFACE

30'-0"

(3) 1-3/8" X 3" X 10' STEEL CHANNEL

FINISHED IN ENAMEL WITH NON-SKID

PLAN VIEW