Luxor|H.Wilson WGB4030 User Manual

Horizontal orientation vertical orientation

Advertising
background image

12/17/13

Wall-mounted Glass Board

Instructions

WARNING: Two people are required to

build this Glass Board. Use care when

handling the Glass Board.

Secure Pucks A at the

bottom like shown with

screw C make sure the

positioning is level and the

notch is facing up, leave

the clamp facing down.

Secure Pucks A at the top

with screw C make sure

the positioning is level and

the notch is facing down,

Secure the clamp with

wrench E so the clamp is

locked, facing up.

Semi-tighten the Puck clamps

A in the up position and place

the silicone inserts D into the

notches. Carefully lift the glass

board so that it rests on top of

the inserts, seated fully into the

notches, then tighten the clamps.

Wedge the silicone inserts

D into the open notch A.

Carefully push the glass

board into the open notch

and fold the silicone over the

glass and tighten the clamps

fully. Assembly Complete!

1

2

3

4

5

Parts List

- Tape Measure

- Chalk Line

- Drill

- 1/4˝ Drill Bit (No Stud)

- 1/8˝ Drill Bit (Stud)

- Extended Drive Phillips

- Hammer

- Level

- Stud Finder

- Pencil

A x4

B x4

C x4

D x4

E x4

Tools Required

Note: Hardware provided is for drywall installation. If attaching

to other material fasteners are to be furnished by other.

Chalk Line desired

bottom position.

Recommended

37

1

4

˝ from floor.

Chalk Line

29

13

16

˝ above the

bottom Chalk

Line

Chalk Line desired

bottom position.

Recommended

31

3

8

˝ from floor.

Chalk Line

39

13

16

˝ above the

bottom Chalk

Line

30˝

40˝

24˝

24˝

32˝

32˝

Hole Locations

Hole Locations

30˝ x 40˝ Board

40˝

30˝

Hole Locations

Hole Locations

Horizontal Orientation

Vertical Orientation

STUD

NO STUD

DRYWALL

RECOMMENDED:

1/8˝ Bit

1/4˝ Bit

DRYWALL

Assembly

Requires Two

People

Perform the

steps detailed in

unison, having a

person on each

side tighten

adjacent pucks

at the same time.

B

A

A

C

C

E

1.

3.

2.

4.

E

E

A

A

A

A

D

D

D

Snap two horizontal chalk

lines at the shown height.

Drill four holes as shown

(Stud is recommended). If

there is no stud Hammer

drywall anchors B into holes.

Advertising