Appendix a - forms – ATS CyberChiller Series User Manual

Page 35

Advertising
background image

(©October, 2006)

CyberChiller Series Installation, Operation & Maintenance Manual

APPENDIX A - FORMS

Stulz Air Technology Systems Inc.

Frederick, Maryland USA 21704

Telephone: (301) 620-2033 Facsimile: (301) 620-1396

Checklist for Completed Installation

Frederick, Maryland USA 21704

CyberChiller Series

Telephone: (301) 620-2033

Facsimile: (301) 620-1396

1

Proper clearances for service access have
been maintained around equipment.

2

Equipment is level and mounting fasteners (if
applicable) are tight.

3

Piping completed to refrigerant or coolant loop
(if required).

4

All field installed piping leak tested.

5

Refrigerant charge added (if required).

6

Incoming line voltage matches equipment
nominal nameplated rating ± tolerances.

7

Main power wiring connections to the

equipment, including earth ground, have been
properly installed.

8

Customer supplied main power circuit breaker

(HACR type) or fuses have proper ratings for
equipment installed.

9

All wiring connections are tight.

10

Control wiring connections completed to

evaporator and condenser/condensing unit
(if required), including wiring to wall mounted
control panel and optional controls.

11

Foreign materials have been removed from

inside and around all equipment installed
(shipping materials, construction materials,
tools, etc.).

12

Compressors and pumps rotate freely without

unusual noise.

13

Inspect all piping connections for leaks during

initial operation.

A-1