Teledyne LeCroy Summit T28 PCIe Multi-lane Protocol Analyzer QSG User Manual
Teledyne LeCroy Equipment
Introduction
Use this document for quick installation and setup.
If you experience problems or need more information, see the Summit T28 User Manual on the Installation CD or at the
Teledyne LeCroy web site.
Summit T28
PCI Express Protocol Analyzer
Quick Start
Components
The analyzer package includes the following components:
•
Summit T28 analyzer box
•
DC Power Adaptor, 12 volts, and AC power cable
•
USB cable
•
PETracer Software program CD-ROM
Depending on configuration, the package may also include:
•
One probe cable for x8 recording
•
Slot interposer
•
MidBus Probe kit
Please see the Summit T28 User Manual on the installation
CD for component specifications and further details.
Summit T28 Protocol Analyzer
1
2
Unpacking the Analyzer
Inspect the received shipping container for any damage. Unpack the container and account for each of the system
components listed on the accompanying packing list. Visually inspect each component for absence of damage.
In the event of damage, notify the shipper and Teledyne LeCroy. Retain all shipping materials for shipper’s inspection.
3