Vestil AHA User Manual

Page 19

Advertising
background image

Copyright 2011 Vestil Manufacturing Corp.

Page 19 of 25


Step 4: Fasten the teletubes to the I-beam.
Insert the flange of the I-beam into the gap between the beam clamp and the beam bracket (see dotted oval and arrow in
Diagram 4B below); then secure the flange on the opposite side to the beam bracket by installing another beam clamp as
shown in Diagram 4A.




Diagram 4A: End View of I-beam Connection to Beam Bracket

of Teletube

























Diagram. 4B: Clamp the I-beam to the tops of the teletubes

2

3


*Item no. Part no.

Description

Quantity

1

33626

½ in. lock washer

8

2

19213-A

½ in. – 13 structural nut

8

3

19213-B

½ in. – 13 x 2½ in. bolt

8

4

28-516-053

Welded beam clamp

4

2

I-beam

Teletube

1

3

Beam
bracket


Teletube

I-beam

3

1



Welded beam clamp




Lower beam flange

Diagram 4D: Top view of beam connection to teletube

Diagram 4C: Exploded Parts View of Beam Clamp Connection to Top Cap

Top cap

Welded
beam
bracket

4

Advertising