Vestil AHA User Manual
Page 19
Copyright 2011 Vestil Manufacturing Corp.
Page 19 of 25
Step 4: Fasten the teletubes to the I-beam.
Insert the flange of the I-beam into the gap between the beam clamp and the beam bracket (see dotted oval and arrow in
Diagram 4B below); then secure the flange on the opposite side to the beam bracket by installing another beam clamp as
shown in Diagram 4A.
Diagram 4A: End View of I-beam Connection to Beam Bracket
of Teletube
Diagram. 4B: Clamp the I-beam to the tops of the teletubes
2
3
*Item no. Part no.
Description
Quantity
1
33626
½ in. lock washer
8
2
19213-A
½ in. – 13 structural nut
8
3
19213-B
½ in. – 13 x 2½ in. bolt
8
4
28-516-053
Welded beam clamp
4
2
I-beam
Teletube
1
3
Beam
bracket
Teletube
I-beam
3
1
Welded beam clamp
Lower beam flange
Diagram 4D: Top view of beam connection to teletube
Diagram 4C: Exploded Parts View of Beam Clamp Connection to Top Cap
Top cap
Welded
beam
bracket
4