Hpc-400 – Vestil HPC-400 User Manual

Page 2

Advertising
background image

01/08

HPC-400,

22-126-120,

0108

V

ESTIL

M

FG

.

C

O

.

2

I

NSTALLATION

I

NSTRUCTIONS

HPC-400

Review this entire page before installing the pail crusher.
Consult the factory in the event there are any questions or problems at the time of installation, or for

information regarding optional features not covered by the owner’s manual.

The pail crusher must be removed from the shipping wood and securely anchored to a concrete surface before

use!

• Modifications or additions to the pail crusher without prior manufacturer’s authorization may void the crusher’s

warranty.

• The installation of this machine must be made so that it complies with all the regulations applicable to the

machine and its location. The end-user must verify that the supplied equipment is installed so it will be suited to

the environment in which it will be used.

• Installation must be performed by suitably trained personnel with access to the appropriate equipment. The

electrical aspects of the installation should be performed by an electrician.

---------------------------------------------------------------------------------------

For a typical installation of a standard pail crusher, you will need the following:
1. A fork truck or hoisting means to unload the pail crusher from the freight truck and set it into place.
2. A smooth, level, and adequately strong concrete surface on which to mount the pail crusher.
3. Concrete anchors, a masonry drill, a masonry bit, and hand tools. Consult the building’s architect or facility

engineer to determine the best size and type of hardware with which to anchor the machine to the floor.

4. An appropriate power supply circuit and electrical disconnect matching the motor voltage and current

requirements. Refer to the machine’s dataplate, to the labels on the control enclosure, and to the electrical
section in this manual for more information. The end-user is responsible for supplying the branch circuit’s required

ground fault and short-circuit protection. (Standard units have a 115V motor with overload protection provided by
a built-in thermostat, and have an 8’ long power cord with a molded 3-prong plug.)

---------------------------------------

To install a standard pail crusher:

1. Move the pail crusher to the location at which it is intended to be operated. Use care to avoid damaging the power

unit’s electrical and hydraulic components.
Caution: Once it is unbanded from the skid, the pail crusher will be top-heavy and can fall over.

Note: The pail crusher’s legs can be removed to allow the pail crusher to be used on top of a heavy work table,
countertop, work bench, etc. If the legs are removed, the unit does not need to be anchored.

2. Anchor the frame to the floor (3/8” max.) through the holes located in the bottom flange of each leg.
3. If applicable, make permanent connection to the power supply, using an appropriate wiring method.
4. Operate the pail crusher through several full crush cycles. Verify that the crush platen’s upper travel limit switch

and the door limit switch function properly.

5. Check the hydraulic oil level. It should be filled to within about 1” of the reservoir’s fill hole. If oil is needed, use

an anti-wear hydraulic oil with a viscosity grade of 150 SUS at 100°F (ISO 32 at 40°C) or a non-synthetic automatic

transmission fluid.

6. Clean up any debris or spilled oil, and verify that all of the information/safety/warning labels are in good

condition.