Removing the monitor board and spo, Modules – ZOLL Propaq M Rev A User Manual
Page 59
Removing the Monitor Board and SpO2 Modules
9650-0804-01 Rev. A
ZOLL Propaq M Service Manual
55
Removing the Monitor Board and SpO
2
Modules
Tool Required
•
# 1 Phillips screwdriver with torque capability
Setup
•
This procedure should be conducted on a static mat.
•
Wear a wrist strap to ground during the procedure.
•
Complete these procedures in the following order before performing this procedure:
1.
“Removing the Handle” on page 43
2.
“Disassembling the Main Unit” on page 44
3.
“Removing the Front Enclosure Module” on page 47
4.
“Removing the Display Module” on page 49
5.
“Removing the EtCO2 and NIBP Modules” on page 51
Note:
After replacing the Monitor Board and/or SpO
2
modules, see Chapter 4, "Resetting
Life Cycle Counters" to reset the life cycle counter for the module.
To reinstall the monitor board and/or SpO
2
modules, reverse the steps.
Monitor Board and/or SpO
2
Disassembly
1
Remove the EtCO2 anti-conductive shield
that lies on top of the unit.
2
Remove six (6) screws to release the
monitor board in the areas illustrated.
Note: During reassembly, torque screws to
6 in-lbs.
shield