2 installation checklist – IEI Integration NOVA-945GSE v1.01 User Manual

Page 88

Advertising
background image

NOVA-945GSE 5.25” SBC

Page 88

o

When working with the NOVA-945GSE, make sure that it is disconnected

from all power supplies and that no electricity is being fed into the system.

Before and during the installation of the NOVA-945GSE DO NOT:

Remove any of the stickers on the PCB board. These stickers are required for

warranty validation.

Use the product before verifying all the cables and power connectors are

properly connected.

Allow screws to come in contact with the PCB circuit, connector pins, or its

components.

5.2.2 Installation Checklist

The following checklist is provided to ensure the NOVA-945GSE is properly installed.

All the items in the packing list are present

A compatible memory module is properly inserted into the slot

The CF Type I or CF Type II card is properly installed into the CF socket

The jumpers have been properly configured

The NOVA-945GSE is inserted into a chassis with adequate ventilation

The correct power supply is being used

The following devices are properly connected

o

Primary and secondary IDE device

o

SATA drives

o

Power supply

o

USB cable

o

Serial port cable

The following external peripheral devices are properly connected to the

chassis:

o

VGA screen

o

Keyboard

o

Mouse

o

RS-232 serial communications device

o

USB devices

Advertising