3 power-on procedure, 1 installation checklist, 2 terminal block pinouts – IEI Integration ECW-281B-N270-WT v3.01 User Manual

Page 71

Advertising
background image

ECW-281B/281B2-R30/N270 Embedded System

Page 56

4.3 Power-On Procedure

4.3.1 Installation Checklist

WARNING:

Make sure a power supply with the correct input voltage is being fed into

the system. Incorrect voltages applied to the system may cause damage to

the internal electronic components and may also cause injury to the user.

To power on the embedded system please make sure of the following:

The bottom surface panel is installed

All peripheral devices (VGA monitor, serial communications devices etc.) are

connected

The power cables are plugged in

The system is securely mounted

4.3.2 Terminal Block Pinouts

The terminal block pinouts are shown in

77

Figure 4-14

.

Figure 4-14: Terminal Block Pinouts

The chassis ground is connected to the ECW chassis internally. The cable ground is

connected to the ground pin on the input power connector of the power module.

Advertising
This manual is related to the following products: