Lincoln Electric 718115 Spirit II 275 User Manual

Page 132

Advertising
background image

Section 6: Maintenance &Troubleshooting

Spirit II User’s Manual

This information is subject to the controls of the Export Administration Regulations [EAR]. This information shall not be provided to

non-U.S. persons or transferred by any means to any location outside the United States contrary to the requirements of the EAR.

6-12

8. With a start signal applied, check the three phase voltage input to each chopper at

the diode bridge terminals (three screws on the left side of each chopper). Refer to

TABLE 1 for the proper three phase AC voltage.

Note that the system will only energize for approximately two seconds each

time a start signal is applied.
If the voltage is not present, check for primary voltage on the main contactor

(CON 1) and on the primary side of the power transformer.

Top View of Chopper

9. With a start signal applied, check for the proper DC voltage (refer to TABLE 1) at the

output terminal block between Electrode and Work.
If the proper DC voltage is present, the chopper is working properly.

TABLE 1

Chopper 1

Chopper 2

Chopper 3

3 Phase

AC

OCV

(DC)

3 Phase

AC

OCV

(DC)

3 Phase

AC

OCV

(DC)

Spirit II

400 Amp

255

370

255

370

255

370

Spirit II

275 Amp

225

325

225

325

N/A

N/A

Spirit II

150 Amp

208

300

N/A

N/A

N/A

N/A

Diode Bridge Terminals

Chopper PCB

J1 Plug

Advertising