Yokogawa Integral Oxygen Analyzer ZR202 User Manual

Page 12

Advertising
background image

<2. Instruction for Replacement of the Heater Unit>

2-3

IM 11M12A01-21E

5. Assembling of Terminal Box and Wiring
Reassemble in reverse order to the above disassembly procedure.

How to identify the wires from the heater strut assembly :

Two wires coming from the ceramic insulator are heaters’. Single-core wire is CELL+. One of two-core

wires with semitransparent silicone tube is TC+ and the other is TC-. (If wire markers are attached to

each wire, connect wires to the corresponding terminal.
6. Installing of the Sensor (Cell)
Install the U-shaped pipe support, the U-shaped Pipe, the Filter and the Sensor (Cell) according to

Section 2.1.3 ” Part Assembly Procedure of Sensor Assembly”. Heater strut assembly

is shipped

with a new contact.

TC

CELL

CJ

1 23 45 6

8

7HTR

F2.2.1E.ai

Bolt

Washer

U-shaped

pipe support

U-shaped

pipe

Filter

Sensor (Cell)

CELL+

Metal O-ring

Contact

TC-

TC+

Turn to

remove

screw

Index jig with

notches

in screw

Grip jig

in spanner

and turn to

unscrew

A

A

View A-A

⑰ ⑱

Figure 2.2

Installation of Model ZR22A HEATER UNIT

when reference gas is natural convection or instrument air (suffix code-A)

Advertising
This manual is related to the following products: