<4. Outline of Software >

4-9

IM 11B03A03-01E

In the case that EPC is installed, three stages of pressure program can be specified.
Figure 4.4 shows the operations for EPC pressure programs.

Initial

control

time

Analysis cycle

Analysis end

Analysis start

Time

First

control

time

Second

control

time

Third

control

time

End of peak detection

time

Third

pressure

gradient

Second

pressure

gradient

First

pressure

gradient

Pressure

Third control

pressure

Second control

pressure

First control

pressure

Initial control

pressure

F0404.EPS

Figure 4.4

Operation for EPC Pressure Programs

4.4

Description of Actions

Actions under the conditions below - stream sequence in Table 4.1, calibration in Table 4.2,
and validation in Table 4.3 - are described as examples.

Table 4.1

First stream

number

Second stream

number

Third stream

number

Fourth stream

number

Stream Sequnce 1

Stream 1

Stream 2

Stream 3

0

Stream Sequnce 2

Stream 4

0

Stream 5

Stream 6

T0401.EPS

Table 4.2

Calibration

stream number

Measuring

times

Validation

stream number

Calibration 1

Stream 7

2

Stream 8

T0402.EPS

Table 4.3

Validation

stream number

Measuring

times

Validation 1

Stream 9

2

T0403.EPS