Yokogawa DAQWORX User Manual

Page 32

Advertising
background image

3

IM WX1000-01E

Setting Up GateMODBUS

7.

Click the Start monitor button.

The value of each tag from the instrument is loaded, and displayed in the
loaded value column of the input tab sheet.

To quit monitor execution, proceed to step 11.

Performing a Write Test

8.

Specify the Output Values of the tags on which you wish to perform the

output test in the output tab page.

9.

Select the tags on which to perform the output test

10.

Click the Output Test button during the Read Test.

The output values are written to registers, then the values are acquired from
the write registers and the loaded results are displayed in the loaded value
column in the output tab page.

Stopping the Read Test

11.

Click the Stop monitor button.

The Monitor Test/Read Test is concluded.

Launching GateCONTROL

12.

Click the Start button in the Acquisition/Status tab.

Click to display the

Error dialog box

Reconnect button

Click here to reopen

communications with the

selected instruments

The practice status

is displayed using

colors

Green: Normal

(comm. open)

Red: Error

(comm. stopped)

Yellow: Data lost, etc.

(comm. open)

No display: Stopped

Start button

Error display example

Advertising
This manual is related to the following products: