Figure 2 - Roof Opening Specifications

To avoid any property damage or

personal injury, it is the installers responsibility
to make sure that the installation will not impair
the function of this curb, or the unit to be
installed.

All curbs must be mounted on level areas. The roof must
be suitable to support the weight of both the curb and
the unit to be mounted. The enclosed area of the roof
curb must comply to required clearances to combustible
materials. If the roof construction is made of combustible
materials, the enclosed roof curb area must meet the
following requirements:
1. Ventilate this area.

2. Leave area open (however, this may elevate higher

sound levels.)

3. Cover this area with non-combustible material,

which utilizes an “R” value of 5.0 minimum.

Position and assemble the curb, referring to Figures 1
thru 8, 17 and 18 and the following procedure:
1. All hardware used for these assembly procedures is

included with your curb, and should be used. Do not
tighten any hardware until the curb is completely
level and square, and installed in a suitable position
on the roof, with proper alignment to the roof/unit
opening(s).

2. Position and install the end and side curb rail sub-

assemblies, aligning around the roof opening loca-
tion(s).

3. Position and install the inner cross brace(s) and

ductwork brackets as shown.

4. Secure the roof curb to the roof decking.

5. Install the field supplied flashing/materials.

6. Apply the gasketing (included with the kit) on the top

flanges/surfaces on the curb as shown

To avoid any property damage or

personal injury, it is the installer’s responsibility
that the roof curb and unit must be completely
sealed, preventing any water or air leakage/
damage.

20-7/8"

(530)

20-7/8"

(530)

A

*

Return

Air

Opening

Supply

Air

Opening

E

*

Section

Y-Y

Section

X-X

Capacity

[ CA ]

Dimension

E *

10/15

20/25/50

30/35/60/70

40/80/12

26"

(660)

37"

(940)

48"

(1219)

53-1/2"

(1359)

Unit Type [ UT ] “RT, PV or AH”

* All Dimensions Shown Have Been Calculated To
Include A One (1) Inch Clearance Around Return
And Supply Ducts.

CURB SPECIFICATIONS

*

ROOF OPENINGS

D3809-4

* Dimension “A” applies to the distance between roof openings (only on units with a supply plenum; also refer to Figure 4):

“A” = 50 -7/8 inches.

Refer to Figure 4 for section X-X and Y-Y details.

Dimensions are in inches (Dimensions in parenthesis are in millimeters).