Contract or – Thermolec AcuSteam User Manual

Page 29

Advertising
background image

Page 27

CONTRACT

OR

NOTE:

The Acu-Steam board has a memory that remembers the last sequence of operation when the power is turned
off, hence the unit might start at step 2 or 3 when you put the power back on. Also, timings may slightly vary
depending on the capacity of the unit (1.5 kW, 3 kW or 4 kW), the pressure of the water inlet and the quality of
the water.

20.12

Please don’t forget to leave this instruction manual with the customer.

Advertising