Attaching front brackets to the switch – Brocade Flush Mount Rack Kit Installation Procedure (Supporting VDX 6710-54, VDX 6720-24, VDX 6720-60, VDX 6730-32, VDX 6730-76, and VDX 6740) User Manual

Page 6

Advertising
background image

6 of 10

Flush Mount Rack Kit Installation Procedure

53-1002127-04

Complete these tasks to install the switch in a rack:

“Attaching front brackets to the switch”

“Attaching front brackets to a rack”

“Attaching rear brackets to a rack”

“Attaching rear brackets to the switch”

Attaching front brackets to the switch

Complete the following steps to attach the front brackets to the switch.

1. Position the right front bracket with the flat side against the right side of the switch as shown in

Figure 2

.

2. Insert two 8-32 x 5/16-in. screws through the pair of vertically aligned holes in the bracket and then into the pair

of holes on the side of the switch.

3. Insert another 8-32 x 5/16-in. screw through the third hole in the bracket and into the corresponding hole in the

switch.

4. Repeat

step 1

through

step 3

to attach the left front bracket to the left side of the switch.

5. Tighten all 8-32 x 5/16-in. screws to a torque of 15 in-lbs. (17 cm-kgs).

FIGURE 2

Attaching the front brackets

1

Front brackets, right and left

3

Screw, 8-32 x 5/16-in., panhead Phillips

1

3

Advertising