Burcam 400500 SEWAGE PUMP 1/2HP 115V User Manual

Model, Installation instructions, Sewage pumps

Advertising
background image

INSTALLATION

INSTRUCTIONS

Your pump has been carefully packaged at the
factory to prevent damage during shipping.
However, occasional damage may occur due to
rough handling. Carefully inspect your pump
for damages that could cause failures. Report
any damage to your carrier or your point
of purchase.

© 2013 BUR-CAM Printed in Canada 400391

MODEL

400500

400510

400500E

SEWAGE

PUMPS

INITIAL START UP PROCEDURES:
1.

Inspect the pump and the sewage tank for

any obvious condition that may

necessitates cleaning, correction,

adjustement or repair.

2.

Assure that the pump is secure and

vertical for proper operation.

3.

Assure that there is adequate clearance

from any combustible materials or

structure. Stored materials must be kept

away from the pump. Shelves or cabinet

structures must not be in close proximity

over the pump.

4.

Assure that the motor is securely plugged

into a proper ‘GFCI’ electrical outlet.

5.

Test the ‘GFCI’ outlet by pressing its test

switch. This should prove that the outlet is

energized and will trip off to protect against

a ground fault. Be sure to reset the ‘GFCI’

by pressing its reset switch.

(Repeat this step monthly)

6.

Lift the float to assure that the pump will

start when required. (Step 7 below will

test submersible pumps with enclosed

floats).

7.

Pour pails of water in the sewage tank to

turn the pump on. Assure that any check

valve present will permit the sewage to flow.

8.

Observe that the plumbing can pump the

sewage safely out of the residence.

(Repeat this step monthly)

www.burcam.com

2190 Dagenais Blvd. West

TEL: 514.337.4415

LAVAL (QUEBEC)

FAX: 514.337.4029

CANADA
H7L 5X9 [email protected]

Please read these

instructions carefully.

Failure to comply to

instructions and

designed

operation of this

system, may

void the

warranty.

Advertising