Earthway Outlet C22HDS User Manual

Page 4

Advertising
background image

12.

Next push lever forward to setting “0”. Align control rod

with hole in pivot bracket, pull lever backward to insert control
rod through hole in pivot bracket. [T

IP

: If the lever does not

move easily, loosen slightly to make this step easier]
Now install 1/4-20 regular nut on to Control rod.

DO NOT TIGHTEN NUTS YET.

11.

I

nstall flattened end of control rod in to lever on gauge into Control

Rod Tabbed hole as shown. Turn to lock in place.
N

EXT

:

Install (1) 1/4-20 Regular Nut [not a locknut] on to Control Rod and
thread halfway as shown to the left.

13.

Pull lever back to setting “30” as shown. Next push pivot &

bracket forward so that the shut off plate in the hopper is in the full open
position. [N

OTE

: T

HE

S

ETTING

OF

“30”

ON

THE

G

AUGE

& L

EVER

A

S-

SEMBLY

MUST

OPEN

THE

S

HUT

-

OFF

COMPLETELY

FOR

PROPER

CALIBRA-

TION

.] Now tighten the nuts against the pivot bracket to prevent change

in calibration. Test by opening and closing the Gauge & Lever a few
times to ensure an accurate calibration.

14

. Insert Agitator to pinion shaft on inside of hopper.

N

OTE

: Position of flat side of agitator. This pin should be

installed as shown.

PAGE 4

15.

Tension on the flow control lever may be adjusted by

tightening or loosening the tension nut as shown on the right.

10.

Install handle shaft to lower handles and pivot & bracket assembly

as shown. Using (4) 1 ½” bolts and (4) locknuts. [T

IP

: Attach right

side first, then attach left (Pivot Bracket) side]

T

IGHTEN

BOLTS

AND

NUTS

NOW

.

Advertising
This manual is related to the following products: