Hired-Hand Light Traps: Installing Continuous Light Trap User Manual

Page 3

Advertising
background image

Hired-Hand Mfg., Inc. • 1733 County Road 68 • Bremen, Alabama 35033 • Phone 256-287-1000 • Fax 256-287-2000

Sheet Part No. 4801-5501 Rev. 5-08

Page 3 of 6

STEP 8

Attach a 60" Extrusion Spacer to

Vertical Spacers using 2 1004-0080 tek screws
per 60" Spacer. An L-Bracket will have to be
attached to the sides using two 1004-2492
bolts per L-Bracket. L-Bracket should be
leveled with holes in Vertical Spacer. See
Figure 5.

STEP 10

Install Extrusions from left to right skipping the first

left slot. (NOTE: Extrusions must be straight, i.e. contacting all
notches.) See Figure 6.

CAUTION: Extrusions must be installed as shown in Detail
A, with rear curved portion toward left end.

Figure 5 – Assemble Spacers

Figure 6 – Assemble Vertical Spacers

STEP 7

Attach a 5

foot spacer to the back
of the Top/Bottom with
four 1004-2492 Tek
Screws. The Spacer
should be centered
between adjoining
Tops/Bottoms, with
flanges facing back.
NOTE: If Post or Cee
is located directly
between adjoining
Top/Bottom, do not
attach spacer. See
Figure 5.

STEP 9

Attach Top row of 12" (30.48 cm)

Extrusion Spacers using two 1004-0080 tek
screws per Spacer. See Figure 5.

5' Vertical
Spacer

L - Bracket

12" Extrusion Spacers

Install Extrusions from
Left to Right

Skip first slot on Left

Extrusions

Extrusions
3/4" spacing – Blackout
1" spacing - Brownout

60" Extrusion
Spacers

Detail A

60“ Extrusion Spacers

Left End of Trap

Advertising